Leading Edge Skin Spar Rivets - 4.8 hours

Craig came by again today and we drilled and riveted the spar-side rivets for the leading edge skins. This was a long and tedious process of carefully drilling hole with jig, deburr, install cleco, move on to next. That being said, it was satisfying to complete and gave the skins a lot of extra strength. It also completed section 501 of the manual. From there, before calling it a day, I glued the bottom side of the landing light housing as described in section 512, paying close attention to not glue the clamps I was using to the landing light housing and also to cleaning up all of the glue that squeezed out.

  1. Wing Manual (EX-2/EX-3) CK-KM301 Rev B, Section 50 

  2. Wing Manual (EX-2/EX-3) CK-KM301 Rev B, Section 51 