Carbon Cub Build 131
- Aileron Control Cable Jul 4, 2023
 - Outboard Tail Rib Jun 24, 2023
 - Stall Warning Cutout Jun 11, 2023
 - Taking Inventory of the Engine and Firewall Forward Kit Jun 10, 2023
 - Trimming the Left Wing Spar Tips Jun 4, 2023
 - Tightening Tank Straps May 30, 2023
 - Left Fuel Tank May 28, 2023
 - Fabric Rivet Holes May 14, 2023
 - Finishing Left Wing Nutplates and Aileron Cable Fairleads May 13, 2023
 - Left Wing Front Tank Nutplates May 12, 2023
 - Left Wing Inboard Rear Tank Nutplate May 9, 2023
 - Installing Spar Side Leading Edge Skin Rivets May 7, 2023
 - Drilling Spar Side Leading Edge Skin Rivet Holes May 6, 2023
 - Riveting Landing Light Housing May 3, 2023
 - Finishing Leading Edge Skins May 1, 2023
 - Window Latch Doubler Apr 27, 2023
 - Tank Extension Skin Apr 13, 2023
 - Marking Spar Drilling Locations Apr 12, 2023
 - Positioning the Inboard Leading Edge Skin Apr 11, 2023
 - Finishing the Outboard Leading Edge Skins Mar 12, 2023
 - Starting the Left Wing Leading Edge Skins Mar 10, 2023
 - Left Wing Wiring Mar 9, 2023
 - Fuel Tank Corner Nutplates Feb 20, 2023
 - Leading Edge Skin Spar Rivets Feb 19, 2023
 - Fuel Tank Bay Skin Feb 18, 2023
 - Landing Light Skin Feb 15, 2023
 - Outboard Leading Edge Skins Feb 11, 2023
 - Trimming the Leading Edge Skin Feb 10, 2023
 - Starting the Top Leading Edge Skin Holes Jan 31, 2023
 - Starting Leading Edge Skins Jan 27, 2023
 - Right Wing Nose Rib Alignment Jan 26, 2023
 - Right Wing Tank Extension Skin and Light Wires Nov 21, 2022
 - Right Wing Center Aileron Hanger Sep 18, 2022
 - Finishing the Aileron False Spar Sep 11, 2022
 - Starting the Aileron False Spar Sep 10, 2022
 - Riveting the Flap False Spar Sep 7, 2022
 - Finishing the Flap False Spar Sep 5, 2022
 - Starting the Flap False Spar Sep 1, 2022
 - Wingtip Wiring Harnesses Aug 28, 2022
 - Rib Rivet Replacement Aug 20, 2022
 - Rib Rivet Removal Aug 17, 2022
 - Right Wing False Rib Aug 15, 2022
 - More Wiring Harnesses Aug 14, 2022
 - First Wing Wiring Harness Jul 24, 2022
 - Starting Wing Wiring Harnesses Jul 22, 2022
 - Inspecting Flap False Spar Jul 20, 2022
 - Finishing Cap Strips Jul 17, 2022
 - Starting Cap Strips Jul 16, 2022
 - Finishing Nose and Tail Ribs Jul 11, 2022
 - Starting Nose and Tail Ribs Jul 10, 2022
 - Finishing Machined Rib Clips Jul 9, 2022
 - Starting Machined Rib Clips Jul 5, 2022
 - Finishing the Rear Spar Reinforcement Jun 27, 2022
 - Deburring the Rear Spar Reinforcement Jun 26, 2022
 - Finishing the Front Pulley Bracket and Starting the Rear Spar Reinforcement Jun 25, 2022
 - Right Wing Front Pulley Bracket Jun 23, 2022
 - Right Wing Re-Trammeling Jun 13, 2022
 - Right Wing Jury Strut Fittings Jun 5, 2022
 - Right Wing Trammeling May 11, 2022
 - Right Wing Tank Straps and Drag Wires May 10, 2022
 - Right Wing Tubes and Ribs May 9, 2022
 - Starting Right Wing May 8, 2022
 - Swapping Wings May 7, 2022
 - Rib Braces and Pitot Bracket Nutplates Apr 26, 2022
 - Retorquing Bolts Apr 19, 2022
 - Installing Capstrip Nutplates Apr 18, 2022
 - Rib 1 and 3 Top Capstrips Apr 14, 2022
 - Rib 1 Bottom Capstrip Apr 12, 2022
 - Riveting Rib 5 Capstrip Apr 10, 2022
 - False Rib and Rib 5 Capstrip Apr 9, 2022
 - Finishing Nose Ribs Apr 8, 2022
 - Match Drilling Nose Ribs Mar 26, 2022
 - Riveting the Nose Ribs to the Spar Mar 20, 2022
 - Finishing the Installation of the Machined Rib/Hanger Clips Feb 21, 2022
 - Starting the Installation of the Outboard Aileron Hanger Clips Feb 20, 2022
 - Installing the Aileron/Flap Hanger Clips and Starting the Nose Ribs Feb 10, 2022
 - Preparing Rib Clips and Nose Ribs Feb 8, 2022
 - Raising Spars Feb 7, 2022
 - Center Aileron Hanger Jan 24, 2022
 - Outboard Aileron False Spar Jan 23, 2022
 - Setting Aileron Hanger Spacing Jan 21, 2022
 - Trimming Nose Ribs Jan 17, 2022
 - Inboard Aileron False Spar Jan 16, 2022
 - Flap False Spar Jan 14, 2022
 - Placing Flap False Spar Jan 10, 2022
 - Tail Ribs Jan 9, 2022
 - Preparing Tail Ribs Dec 5, 2021
 - Rear Aileron Pulley Bracket Dec 2, 2021
 - Riveting the Rear Spar Reinforcement Cap Dec 1, 2021
 - Rudder Pedals and Fuel Selector Nov 21, 2021
 - Placing the Rear Spar Reinforcement Cap Nov 20, 2021
 - Replacing the Front Pulley Bracket Rivet Oct 24, 2021
 - Rudder Pedals Oct 24, 2021
 - Attempting to Remove the Front Pulley Bracket Rivet Oct 10, 2021
 - Front Pulley Bracket Sep 30, 2021
 - Diagonal Cross Tube Sep 5, 2021
 - Trammeling Sep 4, 2021
 - Installing Machined Tail Ribs Sep 1, 2021
 - Finishing Fuel Tank Straps and Drag Wires Aug 20, 2021
 - Fuel Tank Straps and Drag Wires Aug 15, 2021
 - Finish Kit Crate Disassembly Aug 14, 2021
 - Finish Kit Inventory Aug 13, 2021
 - Finish Kit Delivery Aug 11, 2021
 - Deburring Center Rib Hole Jul 25, 2021
 - Reinstalling Center Rib Rivets Jul 20, 2021
 - Removing Center Rib Rivets Jul 18, 2021
 - Riveting Center Ribs Jun 23, 2021
 - Match Drilling Center Ribs Jun 20, 2021
 - Placing Center Ribs Jun 16, 2021
 - Riveting Blocks and Fittings May 28, 2021
 - Shop Organization May 26, 2021
 - Fuselage Rotator May 24, 2021
 - Compression Tubes and Rotators May 23, 2021
 - Drilling Out Tube Rivets May 5, 2021
 - Tubes and Fittings May 4, 2021
 - Sawhorse Leveling and Prep Apr 25, 2021
 - Rear Lift Strut Fitting and Double Ribs Apr 24, 2021
 - Rear Hinge Blocks and Front Lift Strut Fittings Apr 22, 2021
 - Front Spar Hinge Blocks Apr 21, 2021
 - Reaming Spar Hinge Blocks Apr 18, 2021
 - Blocks and Fittings Apr 14, 2021
 - Unpacking - Day 3 Apr 12, 2021
 - Unpacking - Day 2 Apr 11, 2021
 - Part Touch Up Apr 10, 2021
 - Unpacking - Day 1 Apr 9, 2021
 - Spar Fixtures and Aftercooler Apr 8, 2021
 - Crate Disassembly Apr 4, 2021
 - Kit Delivery Apr 1, 2021
 - Sawhorses - Part 2 Mar 26, 2021
 - Sawhorses - Part 1 Mar 24, 2021
 - Workshop Preparation Mar 23, 2021